by admin | May 30, 2022 | Case Study
Following a burst water pipe in an electron microscopy laboratory of a University, FDML were called in to undertake decontamination works on all the affected equipment. FDML produced a detailed report of the equipment that required decontamination works, together with...
by admin | Jan 15, 2022 | Case Study
Following a fire to a 2,000 tonne press, rendering it beyond economical repair, FDML were called in to scope and price the decontamination works to the other presses and tooling which had suffered from smoke contamination. In order to avoid any loss of productivity or...
by admin | May 2, 2021 | Case Study
An office’s IT equipment was subjected to water contamination, as well as ceiling tile debris, due to an overhead air conditioning pipe that had burst over the weekend. It was not until the offices opened on the Monday that the damage was discovered. Without any heat...
by admin | Feb 16, 2021 | Case Study
Extreme rainfall events saturated the drainage systems and overflowed into a factory producing architectural glass roof lights, installed across Europe, Australia and the United States. Water levels rose to over 2 foot across the whole of the ground floor, flooding...
by admin | Jan 29, 2021 | Case Study
When a pipe burst and saturated a mobile imaging unit used for surgical and orthopaedic procedures, FDML was requested to uplift the equipment in order to undertake an urgent drying and decontamination exercise. An immediate response was essential due to the...